Перевод: с английского на все языки

со всех языков на английский

integrated test requirements

См. также в других словарях:

  • Integrated Logistics Support — (ILS) is a technique introduced by the US Army to ensure that the supportability of an equipment is considered during its design and development. The technique was adopted by the UK MOD in 1993 and made compulsory for the procurement of the… …   Wikipedia

  • Test-driven development — (TDD ) is a software development technique consisting of short iterations where new test cases covering the desired improvement or new functionality are written first, then the production code necessary to pass the tests is implemented, and… …   Wikipedia

  • Test probe — Typical passive oscilloscope probe being used for testing an integrated circuit. A test probe (test lead, test prod, or scope probe) is a physical device used to connect electronic test equipment to the device under test (DUT). They range from… …   Wikipedia

  • Test engineer — A (hardware) test engineer (TE) is a professional who determines how to create a process that would test a particular product in manufacturing, or related area like RMA department, in order to guarantee that the product will be shipped out with… …   Wikipedia

  • Test automation — Compare with Manual testing. Test automation is the use of software to control the execution of tests, the comparison of actual outcomes to predicted outcomes, the setting up of test preconditions, and other test control and test reporting… …   Wikipedia

  • Integrated instrumentation system — VIRTUAL INSTRUMENTATIONAn instrument in a measurement system is a device designed specifically for collecting data from an environment or from a unit under test and to display information based on the collected data. The instruments used in… …   Wikipedia

  • Flight test — is a branch of aeronautical engineering that develops and gathers data during flight of an aircraft and then analyses the data to evaluate the flight characteristics of the aircraft and validate its design, including safety aspects. The flight… …   Wikipedia

  • Defense Integrated Military Human Resources System — The Defense Integrated Military Human Resources System was an enterprise program of the Business Transformation Agency s Defense Business Systems Acquisition Executive, within the United States Department of Defense (DoD). As the largest… …   Wikipedia

  • Operational Test and Evaluation Force — (OPTEVFOR) seal Active December, 1947 – Present Country …   Wikipedia

  • Air Force Operational Test and Evaluation Center — Infobox Military Unit unit name= Air Force Operational Test and Evaluation Center caption= Air Force Operational Test and Evaluation Center emblem dates= 1 January 1974 country= United States allegiance= branch= United States Air Force type=… …   Wikipedia

  • Automatic test pattern generation — ATPG (acronym for both Automatic Test Pattern Generation and Automatic Test Pattern Generator) is an electronic design automation method/technology used to find an input (or test) sequence that, when applied to a digital circuit, enables testers… …   Wikipedia

Поделиться ссылкой на выделенное

Прямая ссылка:
Нажмите правой клавишей мыши и выберите «Копировать ссылку»